Hypo Piping in Electrolyzer Installation
April 20, 2019 at 10:36 AM
—
admin
Scales being settled on the hypo tank and pipeline and which had blocked the pipeline over the period of operation.,
Tiaano Design and recommendation:
Conical bottom tank with periodical flushing, thus we could avoid the scale entry on pipe lines from storage tank and design the pipe line with high velocity to increase the turbulence which resulting no settling of scale on pipe line.